Gary Russinko
Principal Engineer
kW Mission Critical Engineering

Monday, June 5
10:00 A.M. – 11:00 A.M.
Future-Proof the Supply Chain (session)

Gary is a Principal Engineer at kW Mission Critical Engineering. He is an electrical engineer with a focus on mission critical facilities design, including on-site generation and various UPS topologies, medium voltage distribution, reliable and redundant distribution system design, grounding, lightning protection, fire alarm and lighting design, and associated construction administration. Responsible for development of junior staff and electrical department management.